Typical Test Times
Back to the AZTEST Enclosure Home Page
Part | Requirement | Typical Duration |
---|---|---|
Instrument Panel | 100,000 TNR Langleys at 102°C | 4.5 to 7 months |
Door Panel Upper / Armrest | 50,000 TNR Langleys at 85°C | 4 to 6 months |
Door Panel Vertical | 5,000 TNR Langleys at 85°C | less than one month |
Console (horizontal position) | 30,000 TNR Langleys at 93°C | 2 to 3 months |
Overhead Parts | 10,000 TNR Langleys at 85°C | 1 to 1.5 months |